Lumenation
Home
Our Team
Linecard
Resources
  • Stand Alone Controls
  • Networked Controls
  • Relay Panels
Projects
Contact Us
Bridge
Lumenation
Home
Our Team
Linecard
Resources
  • Stand Alone Controls
  • Networked Controls
  • Relay Panels
Projects
Contact Us
Bridge
More
  • Home
  • Our Team
  • Linecard
  • Resources
    • Stand Alone Controls
    • Networked Controls
    • Relay Panels
  • Projects
  • Contact Us
  • Bridge
  • Home
  • Our Team
  • Linecard
  • Resources
    • Stand Alone Controls
    • Networked Controls
    • Relay Panels
  • Projects
  • Contact Us
  • Bridge

Valmont's Con-Struct Bridge System is Revolutionary!

  • Better quality
  • Reduced construction time & cost
  • Easy installation
  • Light weight, requiring smaller, less costly equipment, and the ability to reuse existing foundations
  • Pre-Approved - meets all AASHTO, AISC, ASTM, and Kentucky DOT fabrication requirements and design standards

Find out more

What is the cost?

Typical unit cost per square foot of finished bridge deck are:


Delivered: 

Con-Struct ABC  $65-$95 per sft. 

Con-Struct FA Delivered $55-$85 per sft. 


Installed: 

Con-Struct ABC and FA  $100-$145 per sft.


Costs vary based on project needs, location, specifications, method of construction and contracting. These estimates  are provided as a rough outline to give some frame of reference on costs. 

What are the advantages?

  • Better Quality (manufactured in controlled environment)
  • Faster On-Site Construction (less risk of delay due to weather conditions)
  • Reduced Traffic Delays
  • Reduced Construction Time
  • Reduced Overall Construction Cost
  • Increased Job Site Safety (reduced exposure)
  • Aesthetically Pleasing (modern sleek look, available with color options for PBFTG)
  • Convenient and Easy for Owners/Engineers (AASHTO design and load rating included)
  • Ease of Installation (modular units, easy connections)
  • Light Weight (smaller, less costly installation equipment, reuse existing foundations)
  • Increased Service Life (standard galvanized coating has 60+ year maintenance free service
    life, with an additional 40 years from underlying steel)
  • Pre-Designed and Fabricated (meets all AASHTO, AISC, ASTM, and local DOT fabrication requirements and design standards)
  • Sustainable (88% of steel is recycled, zinc coating is inert)

Contact us today for more information!

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

LUMENATION

312 New Venture Drive

Louisville, KY 40214

502-491-8811

Copyright © 2021 Lumenation - All Rights Reserved.

  • Home
  • Our Team
  • Linecard
  • Contact Us